At ARABESQUE, we deliver highly specialized structural, civil, and mechanical engineering solutions for the vital Oil & Gas sector. Navigating the stringent regulatory standards and extreme operational environments of the energy industry requires precision, advanced technical capabilities, and an uncompromising commitment to safety. Our engineering teams specialize in constructing heavy-duty plant foundations, specialized structural pipe racks, modular processing skids, and bulk storage infrastructure that maintain continuous operational uptime under demanding thermal and mechanical loads.
Key Pillars of Our Energy Projects
Blast-Resistant Structural Design: Engineering reinforced concrete structures and control rooms built to withstand extreme overpressure and maximize personnel safety in hazardous areas.
Heavy-Duty Processing Foundations: Fabricating high-capacity deep foundations and vibration-damping concrete sub-structures for heavy rotating machinery, turbines, and high-pressure compressors.
Intricate Modular Pipe Racks: Designing and erecting heavy-gauge structural steel pipe racks and modular process skids optimized for seamless transport, quick on-site integration, and reliable fluid distribution.
REPLACE 4 COMMUNICATION OPERATOR INTERFACE COI’S WITH REDUNDANT STATIONS
Scope of Work:
This project is for the preparation of Detailed Design Package to demolish the existing touch screens for excitation system for GTG # 1,2,3 & 4 to install two new redundant servers stations for the excitation system at new power house control room #2 electrically unclassified area.
STROBE LIGHT REPLACEMENT AT PUMP STATIONS #3 AIRSTRIP
The Existing VASI lightning system located at East West Pipeline Pump Station # 3 Airstrip shall be replaced by precision approach path indicator (PAPI) lightning with remote control system at both ends of the runway.
Scope of Work:
Shall Provide Engineering and drafting services in preparation of detailed design for the total replacement of existing runway end indicating lights system at runway approaching indicating lights system (Retails / Rails) at Pump Station No. 3 Airstrip.
REPLACE PCV AND INSTALL AOV @ QATIF LPG PLANT NO. 017
Shall Provide Engineering and drafting services for the preparation of detailed design for the installation of AOV and replace the PCV @ Qatif LPG
Scope of Work:
The work will include but not limited to the collection and analysis of all data, preparation of detailed design scope of work, development of the required specification, design & drawings ( Process, Mechanical, Instrument, electrical) and MTO and ER Estimate.
TRANSFER GTG HMI #1 & 2 FROM OLD TO NEW POWER HOUSE CONTROL ROOM
Scope of Work:
This project is for the preparation of Detailed Design package to transfer the existing gas turbine generator GTG. HMI #1 & #2 from old power house control room #1 to the new power house control room #2. Install new HMI for GTG #1,2 at old power house for maintenance and engineering and troubleshooting.
MODIFY EXISTING SAMPLE POINT ON LPG RUNDOWN LINE 4”-0-50045-A2A1
Scope of Work:
Shall Include but not limited to the following activities:
Modify the existing sample connection on 4”-50045-A2A1 to be at operator’s position for normal sampling
Make new branch from the sample connection to the flare header (4’-0-055557-a1a1) for flushing purpose.
Replace the temporary platform with permanent access platform.
MODIFY EXISTING SAMPLE POINT ON LPG RUNDOWN LINE 4”-0-50045-A2A1
Scope of Work:
This Project is for preparation of detailed design package to replace the existing gate with a new electric gate with remote control for cars. Also, designing of pedestrian swing gate.